Site icon DailyNews

More water for power generation at Kariba

From January to date, ZP C said 4 4 6 9 .08 GWh was sent out thereby surpassing the target for the period set at 4 17 7 .6 0GWh by 6 .9 8 percent which represents 4 9 percent of the annual target set at 9 111GWh.

THE Zambezi River Authority (ZRA) has increased water allocation for power generation at Kariba Hydro-Power Station despite water levels continuing to plummet...
To access this post, you must purchase a subscription. Please click the button below to visit our subscriptions page to select a package.
Subscriptions
Exit mobile version